BATTEN SPACING - Primtiles Roofing
PRIMTILES ROOFING are supported on roof battens on the rafters. Tack the eaves batten against the fascia board. Then set and tack the second batten to 305mm from the eaves batten. Lay the rest of the battens to module length 305mm across the rafters, up to the ridge and tack them in position.